Skip to content

Goal setting

Tability organises goals into plans that contain objectives, key results and initiatives, each with an owner. Teams write plans in the plan editor, draft them with AI, start from a template or import existing goals.

Read this page as Markdown
Last updated

What a plan contains

Element What it is
Plan A set of goals for a team and a period, with its own dates, reminders, permissions and notes
Sub-plan A plan nested under another. Plans are nested by drag and drop or with "Create sub-plan"
Objective The outcome the team wants. Groups the key results that show progress towards it
Key result A measurable result with an owner, contributors, a target and a type
Initiative A piece of work linked to a key result, with an owner, due date and status
KPI An ongoing metric that can be attached to a plan. See KPIs

Tability supports OKRs, KPIs and hybrid setups in the same workspace.

Six key result types

Type Use it when
From X to Y A number needs to move from a starting value to a target
Stay above X A number needs to hold above a threshold
Stay below X A number needs to hold below a threshold
Non-measurable The result can't be a number and the owner reports progress
Roll-up dependencies Combine values or progress percentages from linked key results. Choose sum for values, average, or latest
Initiatives or milestones completed Track the count or percentage of completed linked initiatives. Count mode measures completed initiatives against a target

Targets take a custom format, such as "$150/user", "NPS 80" or "40 demos".

Key result settings

  • Owner and contributors: one owner, any number of contributors. Teams and agents can be attached.
  • Target milestones: interim targets across the period, drawn as the expected line on the chart.
  • Weight: 0x (ignored), 1x, 2x or 3x in the objective's progress.
  • Label: Standard, Committed or Aspirational by default. Rename these labels and enable or disable the optional Committed and Aspirational categories.
  • Tags: workspace tags for grouping across plans. A key result can be tagged as a KPI.
  • Description: rich text with links, images and attachments.
  • Custom fields: up to two, defined by the workspace.
  • Data source: a connector that supplies the value.

Ways to create a plan

  • Plan editor: write objectives and key results in a document-style editor.
  • AI drafting: describe the goal and Tability proposes objectives, key results and initiatives. AI can also detect and suggest the metric for a key result.
  • AI Importer: upload XLSX, CSV or DOCX goals, then review the proposed structure before importing. Files can be up to 10 MB.
  • Other goal import tools: import goals from pasted text or images.
  • Templates and copy: start from a template or copy an existing plan.
  • Sample plans: new workspaces include sample company, product and sales plans.

Plan lifecycle

Plans are drafted, published, then archived when finished. Actions on a plan: copy, create sub-plan, move, unpublish, archive, export, view activity and view its audit log.

Permissions

Each plan has its own viewing and editing rules, with access granted to individual members or teams. Admins set the default for new plans and can restrict plan creation, deletion and moving to admins and plan admins.

Plan availability

Plan editor, AI drafting, OKR import, templates and individual plan permissions are on Basic. Teams and team-based permissions require Premium or Enterprise.