Go-to-market strategy example

Go-to-market strategy example for a commercial HVAC manufacturer launching a heat pump range

A go-to-market strategy for a manufacturer sets out which buyers a new product line is aimed at, how it gets specified, stocked and installed through the channel, what it costs and the phases of the launch. It is owned by the chief commercial officer and agreed with the leaders of product management, operations, distribution sales and technical service.

This is the Manufacturing version of the go to market strategy template.

Horizon: 3 years5 priorities · 12 outcomes
Use this template Free download

Get the Word file

Enter your work email and the Word version downloads straight away.

We'll email you occasional Tability updates. Unsubscribe at any time.

What this go-to-market strategy template includes

  • ContextThe situation, the challenges to solve, and what is deliberately left out.
  • Target marketWho the product is for and how big the opportunity is.
  • Value propositionThe problem solved and why this solution is better.
  • PricingHow the product is priced and packaged at launch.
  • Routes to marketThe sales and distribution channels and what each is expected to deliver.
  • Launch planThe phases from first customers to full release.
  • Priorities and measuresThree to five priorities, each with an owner, outcomes with a baseline and target, and the initiatives behind them.

Worked example

A complete go-to-market strategy for a fictional organization: manufacturer of commercial rooftop heating and cooling equipment sold through independent distributors.

Worked exampleGo-to-market strategy
OrganizationManufacturer of commercial rooftop heating and cooling equipment sold through independent distributors (5,000 staff)
AmbitionMake our heat pump rooftop units the specified and stocked choice for planned replacements in three launch regions, growing the line from $38 million to $210 million by 2029.
Horizon3 years

Context

Where we are and what we are choosing

Rooftop units bring $640 million of our $1.6 billion revenue, and 94% of that is gas-heated equipment. Our older heat pump models sell 3,300 units a year for $38 million. A new cold-climate heat pump range, 3 to 25 tons, starts production in March 2027 with capacity for 6,000 units in the first year and 18,000 by 2029. We sell through 86 independent distributors with 410 branches, 22 manufacturer's representative firms and a national accounts team. Only 14 branches stock a heat pump today, 180 of 2,300 active contractors are trained to commission one, and we are the basis of design on 4% of the heat pump rooftop specifications we track.

Challenges
  • Seven in ten replacement sales are emergencies filled from branch stock within 48 hours. First-year capacity of 6,000 units cannot stock 410 branches, so the largest part of the market is out of reach at launch.
  • Plan-and-specification projects take 14 to 20 months from design to shipment, and engineers reuse their last equipment schedule. A specification won in 2027 ships in 2028 or 2029.
  • Contractors price the unknowns of swapping gas heat for a heat pump into the bid, or steer the owner back to a like-for-like gas unit: curb adapters, electrical service and complaints on the coldest days.
We will focus on
  • Planned replacements, where the owner has months to choose: national retail and restaurant accounts, school districts and property portfolios with aging units.
  • Three launch regions where distributors already receive requests for electric heating quotes: the Northeast, the Upper Midwest and the Pacific Northwest.
  • The 3 to 12.5 ton sizes first, which are 80% of unit volume. The 15 to 25 ton sizes follow in 2028.
We will not
  • Emergency replacement stock in every branch before 2029. It is the biggest pool of demand, but thin stock spread across 410 branches would mean stockouts and discounting.
  • Selling direct to contractors or building owners online. The margin is about 18 points better, but distributors carry the stock, credit and local service the launch depends on.
  • Pricing at parity with gas units to speed adoption. The range holds a 22% premium and is sold on installed cost and operating cost, at the risk of slower first-year volume.

Target market

Ideal customer profileOwners and operators of light commercial buildings with 5 to 500 packaged rooftop units of 3 to 12.5 tons, most over 12 years old, a capital replacement plan and a target to cut on-site gas use. The buying group is the facilities or energy director, the consulting engineer who writes the equipment schedule, the mechanical contractor and the distributor.
Market sizeWarranty and sell-through records show 1.1 million of our gas rooftop units in service, 310,000 of them over 15 years old. The three launch regions hold 96,000 of those. Converting a quarter of them over the plan would be 24,000 units, about $340 million.
Beachhead segmentPlanned replacements at national accounts and school districts in the launch regions. Our 40 national accounts operate 21,000 of the 96,000 aging units, replace on a schedule and decide once for hundreds of sites.

Value proposition

ProblemAn owner who wants gas off the roof faces a project, not a swap: a curb adapter, often a larger electrical service, and doubt about heating in deep cold. Contractors add contingency for each, and the quote lands far above a like-for-like gas unit.
SolutionA heat pump rooftop range that drops onto our existing curbs with no adapter, keeps 75% of rated heating capacity at 5 degrees Fahrenheit and fits within the existing electrical service on about 60% of our installed gas units up to 12.5 tons. A dual-fuel version keeps a small gas section as backup.
DifferentiatorThe installed base. Our selection tool takes the model and serial number of the unit being replaced and returns the matching heat pump, curb fit and electrical check, so the contractor can quote without a site survey. Parts and startup support come from 410 branches.

Pricing

ModelList price with a distributor multiplier, as on existing lines. Project registration protects the distributor or representative who won the specification. National accounts buy on negotiated multi-year unit prices and take delivery through the local distributor for a handling fee.
Price pointA 22% premium over the equivalent gas unit at distributor net: about $13,400 for a 7.5 ton unit against $11,000. The dual-fuel version adds $1,200. There is no launch discount. Stocking distributors get 120-day terms on their first stock order.
PackagingThree versions in each size: standard efficiency, high efficiency with a variable-speed compressor, and dual fuel. Economizers and open-protocol controls are factory options. The compressor warranty runs 5 years, extended to 10 when a certified contractor files a startup report.

Routes to market

RouteRoleShare of pipeline
Independent distributors, planned replacementStock 3 to 12.5 ton units in launch-region branches and quote with certified contractors40%
Manufacturer's representatives, plan and specificationWin basis of design with consulting engineers for schools, public and commercial projects30%
National accounts teamNegotiate pilots and multi-site rollouts with retail and restaurant chains, fulfilled through distributors25%
Energy service companiesInclude the range in building upgrade projects they finance and manage for owners5%

Launch plan

PhaseTimingGoalExit criteria
Field trialNovember 2026 to February 2027Prove heating performance through a winter on occupied buildings60 units on 12 sites hold setpoint on the coldest days; trial data published for engineers
Regional launch, 3 to 12.5 tonsMarch to December 2027Stock, train and sell in the three launch regions120 branches stocked; 800 certified contractors; 4,500 units shipped
Specification and national rollouts2028Add 15 to 25 tons and convert pilots into multi-site agreementsBasis of design on 19% of tracked specifications; 8 national accounts in rollout; 10,000 units shipped
All regions2029Open the range to all 86 distributors, including emergency replacement stock240 branches stocked; 95% of orders shipped on the acknowledged date; 15,000 units shipped

Priorities and measures

Priority 1Owner: VP of Specification Sales

Get named on the equipment schedule

Engineers reuse the last schedule that worked, and it names two competitors. With 14 to 20 months between design and shipment, the specifications won in 2027 are the volume of 2029.

OutcomeBaselineTargetDue
Tracked heat pump rooftop specifications in launch regions naming us as basis of designMilestones: 10% by FY27 · 19% by FY284%28%FY29
Engineering firms using our selection tool and design files on live projectsMilestones: 40 firms by FY27 · 75 firms by FY2812 firms100 firmsFY29
Initiatives
  • Add the heat pump range to the selection tool with model-for-model replacement lookup
  • Publish design files, guide specifications and the field trial data for engineers
  • Run technical lunch sessions at the 150 firms that write most rooftop schedules in the launch regions
  • Register every specified project so the representative who won it is protected at bid
Targets are illustrative. Adapt them to your baseline before you start.
Priority 2Owner: VP of Distribution Sales

Make the range safe for distributors to stock

A distributor stocks what turns. Only 14 branches carry a heat pump today, and those units turn about twice a year against five for gas units.

OutcomeBaselineTargetDue
Branches stocking the heat pump rangeMilestones: 120 branches by FY27 · 170 branches by FY2814 branches240 branchesFY29
Annual stock turns on heat pump rooftop units at distributorsMilestones: 3 turns by FY27 · 4 turns by FY282.1 turns5 turnsFY29
Initiatives
  • Agree a stocking plan with each launch-region distributor: sizes, quantities and 120-day terms on the first order
  • Train branch counter and inside sales staff to quote from the replacement lookup
  • Allow distributors to rebalance slow-moving units between branches through the factory once a year
  • Share monthly sell-through by branch so stock follows demand
Targets are illustrative. Adapt them to your baseline before you start.
Priority 3Owner: Director of Training and Technical Service

Build a contractor base that can quote and commission

Contractors decide what the owner is offered. Fewer than 1 in 12 of ours is trained on heat pumps, and first-year warranty claims on the older models run more than double the gas rate, mostly from setup errors.

OutcomeBaselineTargetDue
Contractors certified to commission the rangeMilestones: 800 contractors by FY27 · 1,400 contractors by FY28180 contractors2,000 contractorsFY29
First-year warranty claim rate on heat pump rooftop unitsMilestones: 5.5% by FY27 · 4% by FY286.8%3%FY29
Heat pump startups with a filed commissioning reportMilestones: 50% by FY27 · 70% by FY2822%85%FY29
Initiatives
  • Run a one-day certification at distributor branches covering defrost, auxiliary heat staging and electrical checks
  • Tie the 10-year compressor warranty to a startup report filed from the technician's phone
  • Staff a heating-season support line with factory technicians for certified contractors
  • Send a factory technician to each contractor's first three startups
Targets are illustrative. Adapt them to your baseline before you start.
Priority 4Owner: VP of National Accounts

Turn national account pilots into rollouts

Forty national accounts operate 21,000 aging units in the launch regions and replace on a schedule. Each wants a season of data on its own stores before it commits.

OutcomeBaselineTargetDue
National accounts with a signed multi-site heat pump rolloutMilestones: 4 accounts by FY27 · 8 accounts by FY282 accounts14 accountsFY29
Heat pump units ordered a year under national account agreementsMilestones: 1,000 units by FY27 · 2,400 units by FY28400 units3,800 unitsFY29
Initiatives
  • Offer each account a pilot of 6 to 10 sites metered through one heating season, with success measures agreed first
  • Build a replacement schedule for each account from the serial numbers of its installed units
  • Give accounts a per-site report on energy use, comfort complaints and service calls after the pilot
Targets are illustrative. Adapt them to your baseline before you start.
Priority 5Owner: Chief Commercial Officer

Grow revenue at a premium, within what the plant can ship

About half of heat pump sales will replace a gas unit we would have sold anyway. The line earns its investment only if the premium holds and units ship when promised.

OutcomeBaselineTargetDue
Annual heat pump rooftop revenueMilestones: $85M by FY27 · $150M by FY28$38M$210MFY29
Realized price premium over the equivalent gas unitMilestones: 17% by FY27 · 19% by FY289%20%FY29
Heat pump orders shipped on the acknowledged dateMilestones: 88% by FY27 · 92% by FY2881%95%FY29
Initiatives
  • Allocate monthly production between stock orders, registered projects and national accounts, and publish lead times to the channel
  • Require approval from the chief commercial officer for any price below the standard multiplier
  • Phase out the older heat pump models size by size as the new range reaches each branch
  • Decide on the second production line by mid-2028 using registered project and rollout backlog
Targets are illustrative. Adapt them to your baseline before you start.

Blank go-to-market strategy template

The same structure with a prompt in every field. Copy it, or download it as a Word or Excel file.

Your planGo-to-market strategy
Organization[Describe your organization in a few words, with its size]
Ambition[One sentence on where you want to be at the end of the plan]
Horizon[How long the plan runs, for example 12 months]

Context

Where we are and what we are choosing

[Where things stand today: the facts that make this strategy necessary]

Challenges
  • [A problem the strategy has to solve]
  • [A problem the strategy has to solve]
We will focus on
  • [Something you are choosing to concentrate on]
  • [Something you are choosing to concentrate on]
We will not
  • [Something you are deliberately leaving out]
  • [Something you are deliberately leaving out]

Target market

Ideal customer profile[Your ideal customer profile]
Market size[Your market size]
Beachhead segment[Your beachhead segment]

Value proposition

Problem[Your problem]
Solution[Your solution]
Differentiator[Your differentiator]

Pricing

Model[Your model]
Price point[Your price point]
Packaging[Your packaging]

Routes to market

RouteRoleShare of pipeline
[Route][Role][Share of pipeline]
[Route][Role][Share of pipeline]
[Route][Role][Share of pipeline]

Launch plan

PhaseTimingGoalExit criteria
[Phase][Timing][Goal][Exit criteria]
[Phase][Timing][Goal][Exit criteria]
[Phase][Timing][Goal][Exit criteria]

Priorities and measures

Priority 1Owner: [Role accountable for this priority]

[Name the priority in a few words]

[Why this priority matters now, in one or two sentences]

OutcomeBaselineTargetDue
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
Initiatives
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
Priority 2Owner: [Role accountable for this priority]

[Name the priority in a few words]

[Why this priority matters now, in one or two sentences]

OutcomeBaselineTargetDue
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
Initiatives
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
Priority 3Owner: [Role accountable for this priority]

[Name the priority in a few words]

[Why this priority matters now, in one or two sentences]

OutcomeBaselineTargetDue
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
Initiatives
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
Priority 4Owner: [Role accountable for this priority]

[Name the priority in a few words]

[Why this priority matters now, in one or two sentences]

OutcomeBaselineTargetDue
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
Initiatives
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
Priority 5Owner: [Role accountable for this priority]

[Name the priority in a few words]

[Why this priority matters now, in one or two sentences]

OutcomeBaselineTargetDue
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
[Metric you will track][Where it is today][Where it should be][When]
Initiatives
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
  • [A project or action that moves the outcomes above]
Free download

Get the Word file

Enter your work email and the Word version downloads straight away.

We'll email you occasional Tability updates. Unsubscribe at any time.

How to adapt it

  1. 01

    Map everyone who influences the purchase, from specifier to installer to distributor, and write down what each one risks by choosing your new product.

  2. 02

    Split demand by how it is bought: specified projects, planned replacement, emergency replacement and key accounts. Each has its own cycle, stock need and route.

  3. 03

    Set launch volume from plant capacity, then choose regions and channels that capacity can serve well. Do not start from a market share wish.

  4. 04

    Decide what the channel must be able to do before it sells the product, such as stock, quote and commission, and make each a measured outcome.

  5. 05

    Fix the price position and discount authority before the first quote goes out, including how specified projects are protected at bid.

  6. 06

    Give each phase an exit criterion based on shipments, stocking or specifications that someone outside sales can verify.

How to run it

A plan only works if it is reviewed on a rhythm. This is the cadence the example assumes.

Check-inOutcome owners update progress and confidence weekly.
ReviewPriority owners review outcomes and unblock initiatives monthly.
ResetLeadership revisits priorities and targets quarterly.

Tability keeps this cadence for you. Each priority becomes an objective, each outcome a key result with its baseline and target, and each initiative a tracked task. Owners get a check-in reminder and the plan shows what is on track.

Track this plan in Tability

Still comparing tools? See the 10 best strategy software tools.

Common mistakes

  • Announcing a launch to the whole channel when the plant can supply a fraction of it, which produces stockouts and long lead times in the first season.
  • Counting on specification work for first-year revenue when projects take more than a year to reach shipment.
  • Training the sales force and forgetting installers, so the product is quoted reluctantly and commissioned badly.
  • Buying early volume with discounts that become the price the channel expects.

Questions, answered.

How is a go-to-market strategy different for a manufacturer?

A manufacturer usually reaches the end customer through other businesses, so the strategy has to win over each of them. It covers how the product gets specified by engineers, stocked by distributors and installed by contractors, as well as price and launch timing. It is also limited by production capacity in a way software launches are not.

How long should a go-to-market plan for an industrial product run?

Two to three years is common. Tooling, field trials, channel stocking and specification cycles each take months, and projects specified in the first year often ship in the second or third. Plan in phases with interim milestones, and review the plan each quarter against shipments and channel stock.

What does it mean to get a product specified?

It means a design professional, such as a consulting engineer or architect, names your product in the project documents as the basis of design. Bidders must then price your product or prove an alternative is equal. Specification is won before the purchase, through selection tools, design data and relationships with the firms that write the documents.

How should a manufacturer price a new product sold through distributors?

Set a list price and distributor multiplier that leave the channel a normal margin, and position the product against what it replaces using installed and operating cost. Protect registered projects so the partner who created the demand gets the order. Use stocking terms, not price cuts, to reduce the distributor's risk at launch.

How do you avoid channel conflict when launching a new product line?

Write down which route owns which kind of customer before launch, and how an order is credited when two routes touch it. Register projects, route key account orders through the local distributor, and keep any direct sales to segments the channel does not serve. Publish the rules to every partner.