# Goal tracking and check-ins

Tability tracks progress through check-ins: a value, a confidence status and a comment on each key result. Check-ins come from owners, connected data sources or AI agents, and build a week-by-week history for every goal.

Last updated: 2026-11-20

## What a check-in records

| Field | What it captures |
| --- | --- |
| Progress value | Where the key result stands against its target |
| Confidence | On track, at risk or off track |
| Comment | What changed, why, and what happens next, guided by an optional custom prompt |
| Date and author | Who updated and when |

Teammates comment on and react to check-ins. Owners can see who has viewed an update, with names or as an anonymous count, depending on the workspace's privacy setting.

## The key result page

| Part | What it shows |
| --- | --- |
| Chart | Progress over time against the target line, with each check-in coloured by confidence |
| Statistics | Minimum, maximum, average and sum of the values |
| Progress and days left | Current value, percentage of target and time remaining |
| Timeline | Every check-in with its comment and replies |
| Initiatives | The linked work and how much is complete |
| Relationships | The goals this result depends on and supports |
| Details | Owner, contributors, teams, agents, tags and label |
| Notifications | Watchers and Slack notifications for this result |

Actions on a key result: edit, copy, move, align, close, archive, request a check-in, download the chart, embed, and view its audit log.

## Net Confidence Score

The Net Confidence Score (NCS) summarises confidence across a set of key results on a scale from -100 to 100. Tability shows it for the workspace, each plan, each team and each person, with its trend over time.

## Ways to update progress

| Method | How it works | Plan |
| --- | --- | --- |
| Manual check-in | From the web app, mobile app, Slack or Microsoft Teams | Basic |
| Bulk update | Several pending check-ins in one pass | Basic |
| Data connector | Tability reads the value from a connected source | Basic |
| Scheduled sync | The value is read and recorded daily or weekly | Premium |
| Roll-up and initiatives completed | Calculated from dependencies or linked work | Basic |
| Check-ins API and Zapier | Another system submits the update | Basic |
| Agent check-in | An assigned AI agent writes the update | Premium |

## Reminders and rhythm

- **Reminders:** choose weekly, fortnightly, monthly or quarterly when creating a plan. Plan settings allow custom intervals in weeks or months, a start date and an hour, using the workspace time zone.
- **Channels:** email, Slack or Microsoft Teams, and mobile notifications.
- **Reports:** weekly and monthly progress reports on a set day.
- **Pending check-ins:** shown on My focus and as a quick view across the workspace.
- **Request a check-in:** ask an owner for an update on one key result.
- **At-risk limit:** set a per-plan threshold for consecutive at-risk updates. For today's non-closing updates, the check-in form requires on track or off track once the existing streak reaches the threshold.
- **Custom check-in templates:** set the prompt owners answer. Premium.

## Following progress

- **Recent updates:** a feed of check-ins and initiative updates, filtered to all, watched plans, my teams, my direct reports or my agents.
- **Watching:** follow a plan or a key result to be notified of changes.
- **Plan trends:** key results versus initiatives progress, confidence trends and NCS over the plan's period.

## Related

- [Integrations and data](/in-depth/integrations-and-data)
- [Reporting and dashboards](/in-depth/reporting-and-dashboards)
- [Goal-tracking feature page](/features/goal-tracking)
